We woke to a Friday morning with weird lighting fluctuations. I checked the service panel to find a burning smell and melted bus bar under AC breaker. Since bus bar was melted, I contacted SRP who provided some See more
LOAD STUDIES · INFRARED THERMOGRAPHY · ELECTRICAL INSPECTIONS
Replace an overloaded, outdated or unsafe panel with one sized for the load you actually have.
If your panel feels warm, breakers trip often or you are adding load, have it checked. Circuit breaker panels typically last 25 to 40 years, and a panel can be too small long before it wears out.
Heat at the panel can mean an overloaded circuit or a connection that is failing.
Frequent trips or odd sounds point to overload or a worn breaker.
Lights that dim when equipment starts suggest the system is struggling with the load.
If there is no room for a new circuit, the panel is already full.
Zinsco and Federal Pacific panels are widely flagged by inspectors, so have them evaluated.
An EV charger, solar system, air conditioner, addition or new equipment can outgrow an older panel.
Not sure what yours needs? Call (602) 564-1144 and describe what you are seeing.
The electrical panel is the main point where power from the utility connects to the wiring inside your building. It is also called a breaker box, main breaker panel, fuse box, load center or distribution panel. Each breaker in it protects one circuit, and the panel as a whole sets how much power the building can use at once.
We check the panel's condition, open spaces, signs of overheating and the connected load, and whether the service feeding it can carry more.
We agree on the panel size and scope with you, pull the permit and schedule with the city and the utility (APS or SRP) when needed.
Power is shut off while the panel is swapped. We schedule it to disrupt you as little as possible, and for businesses around operating hours. Bonding and grounding are corrected where needed.
We test the new panel, label the circuits and have the work inspected so you can use it with confidence.
The panel is the box inside your building. The service is the connection from the utility, including the meter and the main feed. If the service is too small, a bigger panel alone will not give you more usable power.
We check both before recommending anything. If the service needs work, see our service upgrades. If you are not sure what the building can carry, a load study measures it first.
Older homes often have small, worn or recalled panels, and EV chargers, solar, air conditioning and remodels add load. Aluminum wiring gets checked at the same time.
Residential electrical servicesWe plan around tenants and operating hours, and size the panel for new equipment, code repairs and expansion.
Commercial electrical servicesWe replace aging distribution and unit panels and work with property managers on access and scheduling.
Electrical inspectionsWe replace panels from Square D, Siemens, Cutler Hammer, Eaton, Westinghouse, Crouse Hinds, Murray, Zinsco and Federal Pacific. A panel upgrade often goes together with breaker replacement or aluminum wire repair.
[PLACEHOLDER PROJECT EXAMPLE: one real panel upgrade. Property type, what the old panel was and why it was replaced, the new size, and the result. Replace before publishing.]
The price depends on the panel size in amps, the condition and brand of the old panel, how much wiring or grounding needs correcting, permit and utility requirements, and whether the service also needs an upgrade. We quote after we look at the panel. Call (602) 564-1144 or request a consultation with a short description.
Yes. Power to the building has to be off while the panel is swapped. We plan it with you so it happens at the time that disrupts you least, and for businesses we work around operating hours.
Often. An EV charger, solar system, new air conditioner or addition adds load, and an older panel may not have the capacity or the open spaces. We check the panel and, if needed, run a load study before recommending a size.
We recommend having it evaluated. Inspectors widely flag these older panels because their breakers may not trip when they should. We inspect yours and tell you whether replacement makes sense.
Yes. Panel replacement needs a permit and an inspection from the city, and we coordinate the scheduling with the city and the utility.
Describe the panel, the symptoms and anything you plan to add. We will tell you whether it needs an upgrade and what size.